Tapline - Trans Arabian Pipeline
Company |
|||
![]() Installing the main gravity fed crude oil lines from the tank farm to the shore control. |
![]() Installing crude oil lines to berth no. 5 |
![]() Installing the main gravity fed crude oil lines from the tank farm to the shore control. |
![]() Installing the main gravity fed crude oil lines from the tank farm to the shore control. |
![]() Installing crude oil lines to berth no. 5 |
![]() The Shore Control manifold. |
![]() Monitoring line pressure at the tank farm. |
![]() A view of the Bunker manifold near the Shore Control. |
![]() The Twin GM Diesel transfer pumps in the Bunker Pumphouse near the Shore Control. |
![]() The terminal power station at the tank farm under construction with the Caterpillar-driven generators installed. |
![]() The completed Shore Control manifold. |
![]() The Shore Control building. |
![]() Tankfarm overflow and drain sump. |
![]() View of the shorelines under construction just downstream of the control valves. |
![]() Ground work in progress prior to tank construction at the Tank Farm. |
![]() Berth 5 submarine line floated into position. |