| [Previous] [Main] [Next] | |||
|
Tapline - Trans Arabian Pipeline
Company |
|||
![]() Tie-in of hill lines between tankfarm and Shore Control. |
![]() Berth 5 crude line being strung prior to launching. |
![]() Berth 5 crude line floating and being positioned prior to sinking. |
![]() Berth 5 crude line stringing prior to launching. |
![]() Berth 5 line launching in progress as seen from Pier. |
![]() Submarine line stringing. |
![]() Construction of Bunker Pumphouse. |
![]() The Bunkers pumphouse and manifold with bunkers tank in the background. |
![]() Welding a bunkers line. |
![]() A mooring launch bracing a floating line to berth 5 prior to submerging. |
![]() Pipe anchors on the hill lines, between Tankfarm and Shore Control. |
![]() General view of the Terminal. The white line coming from the hill on the right of the picture is the white chalk where the incoming line is buried. |
![]() Unknown person |
![]() Incoming line scraper trap. Km 1213. |
![]() Pressure reducing station known as the Harp, because it consisted of 11 paralllel 5 inch tubes similar to the strings of a harp. |
![]() View of the tankfarm manifold under construction. |