Tapline - Trans Arabian Pipeline
Company |
|||
![]() View of the shore manifold under construction. |
![]() Tankfarm sludge and overflow sump. |
![]() View of the tankfarm from the incoming line area. |
![]() Berth 5 submarine line floated as seen from the beginning of the Pier. |
![]() Front deck of the Barge. |
![]() Main buoys used for the 5 point mooring system used by Tapline. With the increase in tanker size the number of buoys was increased to 7. |
![]() Assuming left to right: George Hearn, Jim Hughes and unknown third person standing near the Berth 5 line assembly point. |
![]() View of the Terminal from the roof of one of the tanks. |
![]() Shore lines for berth 1,2,3 and 4 under construction. |
![]() Berth 5 being launched, general view. |
![]() Anchors for mooring buoys. |
![]() Line testing at the tank farm. |
![]() Pipe stringing in progress. |
![]() The first four tankers loading at Zahrani in December 1950. |
![]() Line testing at the tank farm. |
![]() The area at the back of the shore control. |
![]() Welding the landlines to the shore control or the line for berth no. 5. |
|||