Al mashriq - The Levant

[Prev] [Next]

Images from pipeline repairs, Tapline


(Courtesy of John Makkinje)

Kilometer 549. The Weld Plus end is pushed over the end of the 5 foot section. At this point some of the oil is still leaking out as the seal bolts were not yet tightened up.


  

al@mashriq

991025/bl