Al mashriq - The Levant

[Prev] [Next]

Images from pipeline repairs, Tapline


(Courtesy of John Makkinje)

Kilometer 549. This is difficult to visualise. It looks down the 5 foot end that was cut off from the main spool piece and at the end is the Weld Pus end from which the pipe slid back, past the seal and thus started leaking. The orange band is the now exposed seal.


  

al@mashriq

991025/bl