INTERNATIONAL BECHTEL INC.
(Which built 854.4 miles of the main
pipe line and the Nariya, Qaisumah, Rafha and Badanah Pump
Stations)
Stephen D. Bechtel, Chairman of the Board
Van W. Rosendahl, President
George S. Colley, Jr., Executive Vice President
J. Roy McAuliffe, Vice President and Project Manager
J. W. Hillman, General Superintendent Pump Station Construction
Roy C. Middleton, General Superintendent Pipe Line Construction
Charles E. Barker, General Superintendent Roads and Transportation
WILLIAMS BROTHERS OVERSEAS COMPANY
(Which built .213.8 miles of the
main pipe line and the Sidon Terminal)
S. M. Williams, Jr., President
A. M. Garber, General Manager
Jack Burroughs, Construction Manager
L. D. McCullough, General Superintendent
F. W. New, Chief Engineer
T. A. Wainwright, Administrative Manager
George Allen, Pipe Line Construction Superintendent
GRAVER CONSTRUCTION COMPANY
(Which built the tankage at Sidon and
the Turaif Pump Station)
E. N. Gosselin, President
J. E. Swanson, Executive Vice President
B.B. McCandless, Secretary and Treasurer
H. A. Scott, Project Manager
Cole Elliott, job Superintendent at Sidon Tank Farm
Leon McCormack, job Superintendent at Turaif Pump Station
John F. McCaughey, Chief Accountant (Beirut)
The Abqaiq pump station and the power plant which supplies steam
for the station's pumping units were constructed by ARAMCO, with
assistance from FLUOR MIDDLE EAST, S. A.