    INTERNATIONAL BECHTEL INC.
    (Which built 854.4 miles of the main pipe line and the Nariya, Qaisumah, Rafha and Badanah Pump Stations)

    Stephen D. Bechtel, Chairman of the Board
    Van W. Rosendahl, President
    George S. Colley, Jr., Executive Vice President
    J. Roy McAuliffe, Vice President and Project Manager
    J. W. Hillman, General Superintendent Pump Station Construction
    Roy C. Middleton, General Superintendent Pipe Line Construction
    Charles E. Barker, General Superintendent Roads and Transportation


    WILLIAMS BROTHERS OVERSEAS COMPANY
    (Which built .213.8 miles of the main pipe line and the Sidon Terminal)

    S. M. Williams, Jr., President
    A. M. Garber, General Manager
    Jack Burroughs, Construction Manager
    L. D. McCullough, General Superintendent
    F. W. New, Chief Engineer
    T. A. Wainwright, Administrative Manager
    George Allen, Pipe Line Construction Superintendent


    GRAVER CONSTRUCTION COMPANY
    (Which built the tankage at Sidon and the Turaif Pump Station)

    E. N. Gosselin, President
    J. E. Swanson, Executive Vice President
    B.B. McCandless, Secretary and Treasurer
    H. A. Scott, Project Manager
    Cole Elliott, job Superintendent at Sidon Tank Farm
    Leon McCormack, job Superintendent at Turaif Pump Station
    John F. McCaughey, Chief Accountant (Beirut)


The Abqaiq pump station and the power plant which supplies steam for the station's pumping units were constructed by ARAMCO, with assistance from FLUOR MIDDLE EAST, S. A.

THE CHICAGO BRIDGE & IRON COMPANY built all tankage in Saudi Arabia except at Turaif.