Tapline [Prev] [Main] [Next]
GENERAL DATA

Aramco 30"-31" Gathering
Facilities
Trans-Arabian
Pipe Line
TOTAL

Maximum Thruput 300,000 BPCD 300,000 BPCD

Length & Size of Pipe 1,314.7 mi. 30-31"OD 747.4 mi. 30-31" OD
6.1 Mi. 22" & 24" OD
1062.1 mi. 30-31" OD
6.1 Mi. 22" & 24" OD
Total: 753.5 mi. 1068.2 Mi.



Volumetric Contents
of Main Line
1,445,100 bbls. 3,454,400 bbls. 4,899,500 bbls.


Total Crude Oil and
Bunkering Tankage
2,384,000 bbls. 3,363,000 bbls. 5,747,000 bbls.


Total Number of Pump
Stations
2 4 6


Total Rated Horsepower of Pumping and Generator Prime Movers
26,100 BHP 50,020 BHP 76,130 BHP



Estimated Final
Total Cost
$62,000,000 $168,000,000 $230,000,000



BPCD - Barrels per calendar day
OD - Outside diameter
BHP - Brake horsepower
[Prev] [Main] [Next]
----------------

al@mashriq

980405/bl