9
|

Sixteen-inch loading hose is attached to the manifold of a tanker
moored in open sea at the Sidon terminal. With this size hose,
introduced to the industry by Tapline, large tankers can be loaded in
a few hours. The oil flows by gravity from shore tanks.
|