The main 30"-31" pipe line of both Aramco Gathering Facilities and
Tapline has been tapered in wall thickness to reduce the initial cost
and steel requirements to a minimum. The tapering is based on balanced
pumping conditions with twelve pump stations at a maximum capacity Of
500,000 barrels per operating day. Initially, only six stations are
being installed with a maximum capacity Of 300,000 barrels per
operating day.
All of the 30"-31" pipe was manufactured by Consolidated Western
Steel Corporation at Maywood, California, from plate supplied by the
Geneva, Utah
|
mill. The plate was rolled into cylinders and
longitudinally welded by the submerged arc process. The joints were
then hydraulically expanded in giant dies to the exact outside
diameters. This cold expansion process increased the yield point to a
minimum Of 52,000 pounds per square inch.
In calculating the required pipe wall thickness, a maximum hoop
stress of 65 per cent of nominal yield or 33,800 pounds per square
inch was used. Based upon this limitation and a minimum wall thickness
of 1/4", the following pipe distribution was installed:
|